Proposed Cell Tower Project

ATT16237The Town of Kennebunk plans to lease land at (unnumbered) Factory Pasture Lane, MBL 052-044 for the location and operation of a telecommunications facility.

This infrastructure has been identified in past planning efforts (see Proposed Wireless Communications Master Plan and Crane Report below) and is consistent with the Comprehensive Plan.

  • There are multiple public benefits to the project:
  • Improved radio signal coverage and redundancy for public safety and the ability to locate their equipment without cost
  • Improved wireless cellular coverage for residents, businesses and visitors in the service area
  • Financial compensation for the Town from the leasing of land

PLEASE VIEW THE FREQUENTLY ASKED QUESTIONS (FAQs) DOCUMENT

A neighborhood meeting was held  on February 12, 2025 featuring a presentation from Town staff and Wireless Edge Towers (the preferred vendor whose proposal was selected from the RFP). View Wireless Edge's presentation document (PDF) here.

Watch the February 12, 2025 Downtown Cell Tower Neighborhood Meeting 

Project Site

cell tower 2

Project Documents and Supporting Materials

Potential Coverage Area 

Proposed Cell Tower - Site Radius